Construction of the Timber Treatment Centre is going to plan. All we need now is the equipment!


This was the scene at our new Timber Treatment centre on Saturday. Just six weeks after the arrival of the first structural steel the frame is complete and the floor is in place. All we need now is the treatment equipment which will be installed before the roof and sides of the building are put in place. There’s still a long way to go but, so far, everything is going to plan.

« | »